January 10, 2018
Beltrame Civil has been awarded the contract for construction of the May Terrace Stage 3 Drainage Upgrade Project for The City of West Torrens.
The project scope includes installation of approx. 650m of reinforced concrete box culverts and reinforced concrete pipe, installation of 31 junction boxes and side entry pits, and connections to existing drainage infrastructure.